Back to allotment listModel basis: Strong basis
CFMEE
09630Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.037 lots | 0.030 lots | Relative deviation 22.6% Absolute diff. 0.007 lots | 0m | 0m |
A tail | 200 | Pool A | 0.195 lots | 0.213 lots | Relative deviation 8.6% Absolute diff. 0.018 lots | 2.5m | 0m |
B head | 400 | Pool B | 0.415 lots | 0.400 lots | Relative deviation 3.7% Absolute diff. 0.015 lots | 5.1m | 0m |
Top | 12,839 | Pool B | 4.094 lots | 3.282 lots | Relative deviation 24.7% Absolute diff. 0.812 lots | 162.2m | 0.1m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.