Sign in to view predicted one-lot hit rates, AI reference scores, grey-market and first-day performance values, and other core fields. Content is general information and education only, not investment advice.
Sign in to viewMECH-MIND ROBOT
09615Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
The one-lot forecast uses a lower-band conservative terminal margin estimate. It is trajectory-based, not an observed final value. Similar-history range:763.7x–6,995.6x。
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
To date, among stocks with published allotment results, the warning system issued10warnings of this type;8correctly identified that the primary would miss.
Subscription tiers
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | Sign in to view | Sign in to view | Sign in to view | 0m | 0m |
A tail | 1,500 | Pool A | Sign in to view | Sign in to view | Sign in to view | 4.6m | 0m |
B head | 2,000 | Pool B | Sign in to view | Sign in to view | Sign in to view | 6.1m | 0m |
Top | 19,284 | Pool B | Sign in to view | Sign in to view | Sign in to view | 58.8m | 0m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.