Back to allotment listModel basis: Strong basis
JD INDUSTRIALS
07618Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.156 lots | 0.350 lots | Relative deviation 55.4% Absolute diff. 0.194 lots | 0m | 0m |
A tail | 1,500 | Pool A | 5.232 lots | 10.000 lots | Relative deviation 47.7% Absolute diff. 4.768 lots | 4.2m | 0m |
B head | 2,000 | Pool B | 20.344 lots | 52.000 lots | Relative deviation 60.9% Absolute diff. 31.656 lots | 5.6m | 0.1m |
Top | 52,802 | Pool B | 512.707 lots | 489.000 lots | Relative deviation 4.8% Absolute diff. 23.707 lots | 148.9m | 1.4m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.