Back to allotment listModel basis: Strong basis
JIANGXI BIO
06915Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.049 lots | 0.020 lots | Relative deviation 146.8% Absolute diff. 0.029 lots | 0m | 0m |
A tail | 800 | Pool A | 0.823 lots | 2.000 lots | Relative deviation 58.8% Absolute diff. 1.177 lots | 4.5m | 0m |
B head | 1,000 | Pool B | 2.577 lots | 2.177 lots | Relative deviation 18.4% Absolute diff. 0.400 lots | 5.6m | 0m |
Top | 3,623 | Pool B | 4.842 lots | 3.365 lots | Relative deviation 43.9% Absolute diff. 1.476 lots | 20.3m | 0m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.