Back to allotment listModel basis: Strong basis
SIGENERGY
06656Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.018 lots | 0.020 lots | Relative deviation 9.5% Absolute diff. 0.002 lots | 0m | 0m |
A tail | 100 | Pool A | 0.095 lots | 0.110 lots | Relative deviation 13.3% Absolute diff. 0.015 lots | 3.2m | 0m |
B head | 200 | Pool B | 0.182 lots | 0.200 lots | Relative deviation 9.2% Absolute diff. 0.018 lots | 6.5m | 0m |
Top | 6,787 | Pool B | 0.992 lots | 1.250 lots | Relative deviation 20.6% Absolute diff. 0.258 lots | 220m | 0m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.