Back to allotment listModel basis: Strong basis
CIG
06166Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.125 lots | 0.050 lots | Relative deviation 149.6% Absolute diff. 0.075 lots | 0m | 0m |
A tail | 1,400 | Pool A | 1.896 lots | 3.954 lots | Relative deviation 52.1% Absolute diff. 2.058 lots | 4.8m | 0m |
B head | 1,600 | Pool B | 4.227 lots | 4.480 lots | Relative deviation 5.6% Absolute diff. 0.253 lots | 5.5m | 0m |
Top | 67,010 | Pool B | 60.455 lots | 87.000 lots | Relative deviation 30.5% Absolute diff. 26.545 lots | 230.8m | 0.2m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.