Back to allotment listModel basis: Strong basis
CIDI
03881Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.299 lots | 0.500 lots | Relative deviation 40.2% Absolute diff. 0.201 lots | 0m | 0m |
A tail | 1,000 | Pool A | 12.700 lots | 30.439 lots | Relative deviation 58.3% Absolute diff. 17.739 lots | 2.6m | 0m |
B head | 2,000 | Pool B | 211.311 lots | 180.000 lots | Relative deviation 17.4% Absolute diff. 31.311 lots | 5.3m | 0.6m |
Top | 13,520 | Pool B | 538.803 lots | 1,162.000 lots | Relative deviation 53.6% Absolute diff. 623.197 lots | 35.6m | 1.4m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.