Back to allotment listModel basis: Strong basis
RIDGE OUTDOOR
02720Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.015 lots | 0.010 lots | Relative deviation 51.9% Absolute diff. 0.005 lots | 0m | 0m |
A tail | 800 | Pool A | 0.153 lots | 0.165 lots | Relative deviation 7.4% Absolute diff. 0.012 lots | 4.9m | 0m |
B head | 1,000 | Pool B | 0.208 lots | 0.200 lots | Relative deviation 4.0% Absolute diff. 0.008 lots | 6.1m | 0m |
Top | 2,820 | Pool B | 0.357 lots | 0.467 lots | Relative deviation 23.4% Absolute diff. 0.109 lots | 17.3m | 0m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.