HK IPOAI
Back to win-rate list

NANHUA FUTURES

02691

Numbers default to the most likely allotment pattern. Clicking another pattern only compares the table; extra-watch notes are historical comparisons and do not change the main reference.

Data updated · Sep 22, 2026, 14:40 HKT

Model basis: Strong basis
How to read this page
  1. Start with one-lot, A-tail and B-head. The table below defaults to the most likely pattern.
  2. The three cards are more likely allotment patterns, not a ranking contest. Clicking another card only compares how the numbers change; it does not replace the main reference.
  3. An extra-watch note names one pattern to compare first. Click it to see how the numbers change. It is not a new main reference and not trading advice.
Predicted one-lot hit rate?
50.0%

Average lots allotted when applying for 1 lot. Closer to 100% means a one-lot application is more likely to get stock.

Official one-lot hit rate?
74.6%
Predicted A-tail allotted?
232.321 lots
Official A-tail allotted
800.000 lots
Predicted B-head allotted?
359.537 lots
Official B-head allotted
1,000.000 lots

Largest Pool A tier, usually the full small-application size. Smallest Pool B tier, just after entering the large-application pool.

Public offer lots
21,532 lots
No extra watch

More likely allotment patterns

“Most likely” is the default method for the current numbers. The other cards are next-likely patterns for comparison. Clicking them does not replace the main reference.

Click to compare the table below. The table changes; the main reference does not.

Average allotment by tier

Key tiers are 1 lot, A-tail, B-head and top hammer. The core column is average allotted lots; the official column appears after allotment is published.
Table scenario
Pool A's allotment rate is roughly flat across application tiers;Pool B allotment is similar across tiers
TypeLotsPoolPredicted avg. allotted?Official avg. allottedDeviationApplication amountExpected allotment value
1 lot
1Pool A50.0%74.6%
Relative deviation 33.0%
Absolute diff. 24.6%
0m0m
A tail
800Pool A232.321 lots800.000 lots
Relative deviation 71.0%
Absolute diff. 567.679 lots
4.8m1.4m
B head
1,000Pool B359.537 lots1,000.000 lots
Relative deviation 64.0%
Absolute diff. 640.463 lots
6m2.2m
Top hammer
1,200Pool B430.651 lots--7.2m2.6m

Win-rate forecasts are informational research output. Likelihood is the published scenario view. Extra-watch notes use forward-only historical samples, do not change the main-reference numbers, are not official allotment certainty, and are not subscription advice.