Back to allotment listModel basis: Strong basis
USAS BUILDING
02671Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.099 lots | 0.007 lots | Relative deviation 910.4% Absolute diff. 0.091 lots | 0m | 0m |
A tail | 2,300 | Pool A | 3.100 lots | 18.769 lots | Relative deviation 83.5% Absolute diff. 15.669 lots | 4.9m | 0m |
B head | 2,800 | Pool B | 11.246 lots | 22.923 lots | Relative deviation 50.9% Absolute diff. 11.677 lots | 6m | 0m |
Top | 4,100 | Pool B | 14.811 lots | 33.500 lots | Relative deviation 55.8% Absolute diff. 18.689 lots | 8.7m | 0m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.