Back to allotment listModel basis: Strong basis
NUOBIKAN
02635Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.068 lots | 0.030 lots | Relative deviation 125.7% Absolute diff. 0.038 lots | 0m | 0m |
A tail | 1,200 | Pool A | 1.877 lots | 6.950 lots | Relative deviation 73.0% Absolute diff. 5.073 lots | 4.8m | 0m |
B head | 1,400 | Pool B | 4.817 lots | 7.870 lots | Relative deviation 38.8% Absolute diff. 3.052 lots | 5.6m | 0m |
Top | 3,787 | Pool B | 8.100 lots | 17.527 lots | Relative deviation 53.8% Absolute diff. 9.427 lots | 15.1m | 0m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.