Back to allotment listModel basis: Strong basis
SICC
02631Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.093 lots | 0.300 lots | Relative deviation 69.1% Absolute diff. 0.207 lots | 0m | 0m |
A tail | 1,000 | Pool A | 1.631 lots | 1.300 lots | Relative deviation 25.5% Absolute diff. 0.331 lots | 4.3m | 0m |
B head | 2,000 | Pool B | 2.560 lots | 4.883 lots | Relative deviation 47.6% Absolute diff. 2.323 lots | 8.6m | 0m |
Top | 11,936 | Pool B | 15.210 lots | 17.000 lots | Relative deviation 10.5% Absolute diff. 1.790 lots | 51.1m | 0.1m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.