HK IPOAI
Back to win-rate list

NEXCHIP

02249

Numbers default to the most likely allotment pattern. Clicking another pattern only compares the table; extra-watch notes are historical comparisons and do not change the main reference.

Data updated · Sep 22, 2026, 14:40 HKT

Model basis: Strong basis
How to read this page
  1. Start with one-lot, A-tail and B-head. The table below defaults to the most likely pattern.
  2. The three cards are more likely allotment patterns, not a ranking contest. Clicking another card only compares how the numbers change; it does not replace the main reference.
  3. An extra-watch note names one pattern to compare first. Click it to see how the numbers change. It is not a new main reference and not trading advice.
Predicted one-lot hit rate?
3.7%

Average lots allotted when applying for 1 lot. Closer to 100% means a one-lot application is more likely to get stock.

Official one-lot hit rate?
8.0%
Predicted A-tail allotted?
1.432 lots
Official A-tail allotted
3.000 lots
Predicted B-head allotted?
5.667 lots
Official B-head allotted
5.000 lots

Largest Pool A tier, usually the full small-application size. Smallest Pool B tier, just after entering the large-application pool.

Public offer lots
216,167 lots
No extra watch

More likely allotment patterns

“Most likely” is the default method for the current numbers. The other cards are next-likely patterns for comparison. Clicking them does not replace the main reference.

Click to compare the table below. The table changes; the main reference does not.

Average allotment by tier

Key tiers are 1 lot, A-tail, B-head and top hammer. The core column is average allotted lots; the official column appears after allotment is published.
Table scenario
Larger Pool A applications get less extra allotment;Pool B allotment declines gradually with size
TypeLotsPoolPredicted avg. allotted?Official avg. allottedDeviationApplication amountExpected allotment value
1 lot
1Pool A3.7%8.0%
Relative deviation 54.0%
Absolute diff. 4.3%
0m0m
A tail
1,000Pool A1.432 lots3.000 lots
Relative deviation 52.3%
Absolute diff. 1.568 lots
3.2m0m
B head
2,000Pool B5.667 lots5.000 lots
Relative deviation 13.3%
Absolute diff. 0.667 lots
6.5m0m
Top hammer
108,083Pool B88.840 lots191.000 lots
Relative deviation 53.5%
Absolute diff. 102.160 lots
349.1m0.3m

Win-rate forecasts are informational research output. Likelihood is the published scenario view. Extra-watch notes use forward-only historical samples, do not change the main-reference numbers, are not official allotment certainty, and are not subscription advice.