Back to allotment listModel basis: Strong basis
XIZHI TECH-P
01879Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.040 lots | 0.060 lots | Relative deviation 33.0% Absolute diff. 0.020 lots | 0m | 0m |
A tail | 1,000 | Pool A | 0.559 lots | 0.919 lots | Relative deviation 39.1% Absolute diff. 0.360 lots | 2.7m | 0m |
B head | 2,000 | Pool B | 1.394 lots | 1.600 lots | Relative deviation 12.9% Absolute diff. 0.206 lots | 5.5m | 0m |
Top | 22,992 | Pool B | 4.122 lots | 4.415 lots | Relative deviation 6.6% Absolute diff. 0.293 lots | 63.2m | 0m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.