Back to allotment listModel basis: Strong basis
LINGYI ITECH
01688Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.068 lots | 0.012 lots | Relative deviation 456.3% Absolute diff. 0.056 lots | 0m | 0m |
A tail | 700 | Pool A | 10.002 lots | 8.588 lots | Relative deviation 16.5% Absolute diff. 1.414 lots | 4.7m | 0.1m |
B head | 800 | Pool B | 8.268 lots | 7.219 lots | Relative deviation 14.5% Absolute diff. 1.050 lots | 5.4m | 0.1m |
Top | 61,501 | Pool B | 571.484 lots | 555.000 lots | Relative deviation 3.0% Absolute diff. 16.484 lots | 413.2m | 3.8m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.