HK IPOAI
Back to win-rate list

WERIDE-W

00800

Numbers default to the most likely allotment pattern. Clicking another pattern only compares the table; extra-watch notes are historical comparisons and do not change the main reference.

Data updated · Sep 22, 2026, 14:40 HKT

Model basis: Strong basis
How to read this page
  1. Start with one-lot, A-tail and B-head. The table below defaults to the most likely pattern.
  2. The three cards are more likely allotment patterns, not a ranking contest. Clicking another card only compares how the numbers change; it does not replace the main reference.
  3. An extra-watch note names one pattern to compare first. Click it to see how the numbers change. It is not a new main reference and not trading advice.
Predicted one-lot hit rate?
28.8%

Average lots allotted when applying for 1 lot. Closer to 100% means a one-lot application is more likely to get stock.

Official one-lot hit rate?
6.6%
Predicted A-tail allotted?
9.438 lots
Official A-tail allotted
66.309 lots
Predicted B-head allotted?
112.579 lots
Official B-head allotted
92.436 lots

Largest Pool A tier, usually the full small-application size. Smallest Pool B tier, just after entering the large-application pool.

Public offer lots
176,500 lots
No extra watch

More likely allotment patterns

“Most likely” is the default method for the current numbers. The other cards are next-likely patterns for comparison. Clicking them does not replace the main reference.

Click to compare the table below. The table changes; the main reference does not.

Average allotment by tier

Key tiers are 1 lot, A-tail, B-head and top hammer. The core column is average allotted lots; the official column appears after allotment is published.
Table scenario
Larger Pool A applications get less extra allotment;Pool B allotment falls more sharply with size
TypeLotsPoolPredicted avg. allotted?Official avg. allottedDeviationApplication amountExpected allotment value
1 lot
1Pool A28.8%6.6%
Relative deviation 333.7%
Absolute diff. 22.2%
0m0m
A tail
1,000Pool A9.438 lots66.309 lots
Relative deviation 85.8%
Absolute diff. 56.871 lots
2.7m0m
B head
2,000Pool B112.579 lots92.436 lots
Relative deviation 21.8%
Absolute diff. 20.143 lots
5.4m0.3m
Top hammer
22,062Pool B364.863 lots1,019.625 lots
Relative deviation 64.2%
Absolute diff. 654.762 lots
59.8m1m

Win-rate forecasts are informational research output. Likelihood is the published scenario view. Extra-watch notes use forward-only historical samples, do not change the main-reference numbers, are not official allotment certainty, and are not subscription advice.