Back to allotment listModel basis: Strong basis
JOYSON ELEC
00699Joint-scenario probability is the final recommendation. Switch among the Top 3 or a warned scenario to inspect its effect on average allotted lots by tier.
Joint-scenario Top 3
Only joint probabilities that account for Pool A/B dependence are shown. Top 2/3 are alternatives; single-pool probabilities remain internal model inputs and are not published.
Subscription tiers
Prospectus subscription tiers are shown; the core field is average allotted lots, and key tiers are highlighted.
| Type | Lots | Pool | Predicted avg. allotted? | Official avg. allotted | Deviation | Application amount | |
|---|---|---|---|---|---|---|---|
1 lot | 1 | Pool A | 0.079 lots | 0.160 lots | Relative deviation 50.6% Absolute diff. 0.081 lots | 0m | 0m |
A tail | 400 | Pool A | 1.117 lots | 0.191 lots | Relative deviation 485.2% Absolute diff. 0.926 lots | 4.4m | 0m |
B head | 600 | Pool B | 3.367 lots | 8.316 lots | Relative deviation 59.5% Absolute diff. 4.949 lots | 6.6m | 0m |
Top | 15,510 | Pool B | 34.144 lots | 8.625 lots | Relative deviation 295.9% Absolute diff. 25.519 lots | 170.6m | 0.4m |
Allotment forecasts are informational research output. Joint-scenario probability is the only published scenario-probability view; Pool A/B probabilities remain internal model inputs. Warnings use forward-only historical data and do not alter the official probabilities or default choice.